menu  
  • Intro
  • First to Go
  • Peachy
  • Bloody Vandals
  • Nuestro Apartamento
  • Piers
  • Cracking
  • Trouble
  • Siding
  • The Wall
  • Porch
  • Entryway
  • Front
  • Wood Floors
  • Anatomy of a Room
  • Colors
  • Kitchen cabinets
  • Guest Room after moldings
  • Lounge
  • Dining Area
  • Porch columns
  • Kitchen Floor
  • Kitchen/Family Rm. Floor
  •  

     

    The excavation went on for roughly a decade.  Okay, maybe three weeks.  That's a lot of James Brown songs.  And I really like James Brown.  Or used to.

    The floors were leveled in about a week, after which a battalion of piers were arranged at six-foot intervels beneath the original section of the house.

    This took, in our highly technical estimation, forever.  Okay, maybe a couple of weeks. But it was worth it.  After four and a half years learning to walk upright on crooked floors, gradually adjusting our equilibriums to levels befitting sailors, it felt a little weird to walk on level floors.  Weird, but good. 

    We were feeling pretty good about things for, oh, it must have been two or three days.